System Floor OKIJIKI
Case Studies: Case1
PT. INPEX
(Installation in New Building)
Project Outline
Project owner: Inpex Corporation
Prime contractor: KDDI Indonesia
Construction period: 2014
Size: Approx. 10,000 m2
Challenge
- -The office is large and the office layout is changed frequently, so the company wanted to conceal cables and streamline rerouting work.
- -The company wanted to route cables flexibly under the floor, not above the ceiling.
- -The project was large in scale and had to be completed in a short period of time.
- -The floor load caused by the floor system had to be as low as possible.
- -The floor panels had to be as strong as steel panels.
Solution
- -The product quality was inspected in the factory prior to delivery.
- -High-safety Easy Wiring was used to allow flexible rerouting of cables after installation.
- -Panels were installed in a short period of time after clearing furniture from the floor.
- -FPZ was used at sections where cables are concentrated or main cables run through.
- -Vinyl sheets were used to cover OKIJIKI panels for protection.
- -Lightweight partitions can be installed flexibly after the installation of floor panels.
- -Flexible borders were utilized to cope with the many curved sections on the structural walls.