System Floor OKIJIKI

Case Studies: Case1

PT. INPEX

(Installation in New Building)

Project Outline

Project owner: Inpex Corporation
Prime contractor: KDDI Indonesia
Construction period: 2014
Size: Approx. 10,000 m2

Challenge

  • -The office is large and the office layout is changed frequently, so the company wanted to conceal cables and streamline rerouting work.
  • -The company wanted to route cables flexibly under the floor, not above the ceiling.
  • -The project was large in scale and had to be completed in a short period of time.
  • -The floor load caused by the floor system had to be as low as possible.
  • -The floor panels had to be as strong as steel panels.

Solution

  • -The product quality was inspected in the factory prior to delivery.
  • -High-safety Easy Wiring was used to allow flexible rerouting of cables after installation.
  • -Panels were installed in a short period of time after clearing furniture from the floor.
  • -FPZ was used at sections where cables are concentrated or main cables run through.
  • -Vinyl sheets were used to cover OKIJIKI panels for protection.
  • -Lightweight partitions can be installed flexibly after the installation of floor panels.
  • -Flexible borders were utilized to cope with the many curved sections on the structural walls.
  • Case 1 PT. INPEX
  • Case 2 PT. NIC
  • Case 3 Jakarta Shimbun Building

LAYANAN INFORMASIJika anda membutuhkan informasi lebih lanjut mengenai
produk dan solusi dari kami, klik disini.

Where to Buy

Contents

Showroom

Showroom

Toko

Toko

Events

Events

Solutions

Solutions

Knowledge

Knowledge