Main Contents begins from here.
Technical Drawings
- CAPSULE BODY (SECTION)
1a. CAPSULE BODY DETAIL
- STEEL CONTAINER (SECTION)
2a. STEEL CONTAINER DETAIL
- CAPSULE N0.1 : CONCRETE ENCLOSURE
- CAPSULE N0.2 : CONCRETE ENCLOSURE
- BURIAL STRUCTURES
5a. STEEL TUBE SOIL PILES
- CONCRETE ENCLOSURE PLACEMENT HARDWARE (CAPSULE NO.1)
- MONUMENT DETAIL
7a. MONUMENT BASE PLAN
7b. MONUMENT AND BASE DETAIL
7c. EPITAPH BASE DETAIL
- CYLINDER CONTAINING UNEARTHING AND OPENING INSTRUCTIONS
- BORlNG AND BURIAL SITE: PLAN AND ELEVATION
9a. SOIL EXPLORATION (BORING LOG)
1. CAPSULE BODY (SECTION)
Material:NTK-22AT Stainless Steel
Scale 1/10
1a. CAPSULE BODY DETAIL
2. STEEL CONTAINER (SECTION)
Material:NTK-22AT Stainless Steel
Scale 1/10
2a. STEEL CONTAINER DETAIL
3. CAPSULE NO.1 : CONCRETE ENCLOSURE
Assembly sequence
- Exterior bottom panel
- Mortar
- Exterior tube
- Mortar
- Base concrete
- Inner base (placed prior to hardening of 5)
- Mortar
- Reinforcing steel bar
- Mortar
- Inner tube
- Time capsule placement
- Bentonite fill
- Intermediate concrete
- Mortar
- Inner cover (placed prior lo hardening of 13 & 14)
- Mortar
- Concrete
- Mortar
- Outer cover
- Mortar injection
- *2, 4, 5, 7, 9, 13, 14, 16, 17, 18, 20 using expansive cement
- *3, 10 using hume pipe.
- *1, 6, 15, 19 using precast concrete panels
4. CAPSULE NO.2 : CONCRETE ENCLOSURE
5. BURIAL STRUCTURES
Scale 1/120
5a. STEEL TUBE SOIL PILES
6. CONCRETE ENCLOSURE PLACEMENT HARDWARE (CAPSULE NO.1)
7. MONUMENT DETAIL
7a. MONUMENT BASE PLAN
7b. MONUMENT AND BASE DETAIL
7c. EPITAPH BASE DETAIL
8. CYLINDER CONTAINING UNEARTHING AND OPENING INSTRUCTIONS
9. BORlNG AND BURIAL SITE: PLAN AND ELEVATION
9a. SOIL EXPLORATION (BORING LOG)
Return to top