Main Contents begins from here.
Technical Drawings
![](./img/idx.gif)
- CAPSULE BODY (SECTION)
1a. CAPSULE BODY DETAIL
- STEEL CONTAINER (SECTION)
2a. STEEL CONTAINER DETAIL
- CAPSULE N0.1 : CONCRETE ENCLOSURE
- CAPSULE N0.2 : CONCRETE ENCLOSURE
- BURIAL STRUCTURES
5a. STEEL TUBE SOIL PILES
- CONCRETE ENCLOSURE PLACEMENT HARDWARE (CAPSULE NO.1)
- MONUMENT DETAIL
7a. MONUMENT BASE PLAN
7b. MONUMENT AND BASE DETAIL
7c. EPITAPH BASE DETAIL
- CYLINDER CONTAINING UNEARTHING AND OPENING INSTRUCTIONS
- BORlNG AND BURIAL SITE: PLAN AND ELEVATION
9a. SOIL EXPLORATION (BORING LOG)
1. CAPSULE BODY (SECTION)
![](./img/1.gif)
Material:NTK-22AT Stainless Steel
Scale 1/10
1a. CAPSULE BODY DETAIL
![](./img/1a.gif)
2. STEEL CONTAINER (SECTION)
![](./img/2.gif)
Material:NTK-22AT Stainless Steel
Scale 1/10
2a. STEEL CONTAINER DETAIL
![](./img/2a.gif)
3. CAPSULE NO.1 : CONCRETE ENCLOSURE
![](./img/3.gif)
Assembly sequence
- Exterior bottom panel
- Mortar
- Exterior tube
- Mortar
- Base concrete
- Inner base (placed prior to hardening of 5)
- Mortar
- Reinforcing steel bar
- Mortar
- Inner tube
- Time capsule placement
- Bentonite fill
- Intermediate concrete
- Mortar
- Inner cover (placed prior lo hardening of 13 & 14)
- Mortar
- Concrete
- Mortar
- Outer cover
- Mortar injection
- *2, 4, 5, 7, 9, 13, 14, 16, 17, 18, 20 using expansive cement
- *3, 10 using hume pipe.
- *1, 6, 15, 19 using precast concrete panels
4. CAPSULE NO.2 : CONCRETE ENCLOSURE
![](./img/4.gif)
5. BURIAL STRUCTURES
![](./img/5.gif)
Scale 1/120
5a. STEEL TUBE SOIL PILES
![](./img/5a.gif)
6. CONCRETE ENCLOSURE PLACEMENT HARDWARE (CAPSULE NO.1)
![](./img/6.gif)
7. MONUMENT DETAIL
![](./img/7.gif)
7a. MONUMENT BASE PLAN
![](./img/7a.gif)
7b. MONUMENT AND BASE DETAIL
![](./img/7b.gif)
7c. EPITAPH BASE DETAIL
![](./img/7c.gif)
8. CYLINDER CONTAINING UNEARTHING AND OPENING INSTRUCTIONS
![](./img/8.gif)
9. BORlNG AND BURIAL SITE: PLAN AND ELEVATION
![](./img/9.gif)
9a. SOIL EXPLORATION (BORING LOG)
![](./img/9a.gif)
Return to top